Construction price

A. PRICE OF ROUGH STRUCTURE PACKAGES:
Customers can choose one of the following construction packages:

No. Item & Description Basic package Standard package Advanced package
I Total price 2,800,000 VND/m2 3,000,000 VND/m2 ≥ 3,500,000 VND/m2
II Applying conditions
1 Materials can conveniently gathering at works by small trucks Ok Ok No
2 Conditions of total building area ≥ 400 m2 200 ÷ 400 m2 ≤ 200 m2
3 Conditions of locating at between two adjacent houses In middle of existing houses Not meet Not meet
III Materials of package
01 Steel of VINAUSTEEL/VIETNAM-ITALY STEEL Co. X X X
02 Crushed rock 1×2, 4×6 from Hoa Cam X X X
03 Sand from Tuy Loan village X X X
04 Cement Kim Đinh/Hoang Thach/Nghi Son Co. X X X
05 Commercial concrete of Dang Hai co. X X X
06 Clay bricks of Dai Hiep factory, Dai Loc, Quang Nam province X X X
07 Hosepipe of Binh Minh Plastic co. X X X
08 Electrical cable/wire of CADIVI co. X X X
09 Wires for cable TV, ADSL, phone: SINO co. X X X
10 Rigid conduit in the concrete floor: VEGA co. X X X
11 Flexible conduit for protecting electrical wire: SINO co. X X X
12 Waterproofing chemicals for floor : Sika co. X X X
13 Formwork: film wood, steel column X X X
IV Jobs of pakage
01 Keep work site clean, locating the center of structures and the standard level X X X
02 Earthwork of: foundation, septic tank, underground water tanks; transporting rubble from the site X X X
03 Pressing reinforced concrete piles, Reinforcing the foundation by pressing piles No No X
04 Smashing pile head X X X
05 Pouring concrete lining of foundation, 4×6 rock, grade 100 #, 100mm thick X X X
06 Production and erecting formwork, reinforcing steel and pouring concrete: simple foundation, foundation beam X X X
07 Production and erecting formwork, reinforcing steel and pouring concrete: strip foundation No No X
08 Production and erecting formwork, reinforcing steel and pouring concrete: columns, beams, floor, stair X X X
09 Placing outside walls, division walls in the whole project X X X
10 Erecting plumbing, electrical wires X X X
11 Roof deck and WC floor waterproofing X X X
12 Plastering for all walls X X X
13 Screeding for all floors X X X
14 Tiling for all faces (not including tile and sealing grout) X X X
16 Installing electrical systems and lights (including wires but not including electrical equipments and lights) X X X
17 Electrical equipments, lights, tiles and sealing grout No No X
18 Cleaned daily work X X X
19 Basic cleaning work before handover X X X

Notes:

  • Package construction means the customer is only responsible for construction permits, permission to use the pavement. After handing over the ground and power / water to us, we will do all the rest for construction until completion of the entire works or a part of works already concluded that in the construction contract.
  • Please see how the area will be used to determine the total cost of the package at the section of “Entire building construction price”.

 

B. ENTIRE BUILDING CONSTRUCTION PRICE:

Customers can choose one of the following construction packages:

TT Basic package Standard package Advanced package
I 4.900.000 VND/m2 5.500.000 VND/m2 6.500.000 VND/m2
01 Including standard rough structure package Including standard rough structure package Including standard rough structure package
02 Inax sanitary equipments, lavatory bowl C117 – two blocks Inax sanitary equipments, lavatory bowl C117 – two blocks – two flushing modes Advanced Inax sanitary equipments, one block lavatory bowl
03 Taicera tiles, tiles 60×60 for floor, tiles 30×45 for bathroom walls Taicera tiles, tiles 60×60 for floor, tiles 30×60 for bathroom walls Boao tiles, tiles 60×60 for floor, tiles 30×60 for bathroom walls, Laminate wood for bedroom floor
04 Economic Maxilite paint for the whole house Dulux paint for front faces, Maxilite paint for interior faces Dulux paint for the whole house
05 Front doors with galvanized iron, powder coated; Aluminum glass doors for interior Plastic doors with steel core at the front, interior doors making from cherry, PU coating Natural wood doors for the entire house, PU coating
06 Thanh Hoa granite / chinese granite for treads and risers of stairs Granite from An Khe, Gia Lai province for treads and risers of stairs Treads and risers of stairs are coated with wooden panels, wooden handrail, PU coating
07 Lighting equipments are florescent lights 1.2m Lighting equipments are downlight lights Lighting equipments are downlight lights with light-emitting diode technology
08 Gypsum ceiling Vinh Tuong, applying only in the living room Gypsum ceiling Vinh Tuong, applying in the entire house Gypsum ceiling Vinh Tuong, applying in the entire house

 

Applying conditions:

  • Total floor area > 280 m2.
  • The investor is responsible for providing power and water source for construction.

The case of additional costs:

  • Total floor area ≤ 280 m2.
  • Can not deliver materials conveniently to the site by small truck.
  • Site locate in the area of ​​market, the delivering of construction materials is interrupted or we have to gather materials at night.
  • The above packages don’t include: reinforced foundation costs, tape foundation costs, costs for work related to concrete piles, bored piles, melaleuca piles, the basement walls with > 60cm deep; outside scaffolding for the entire works, geological survey costs, surveying costs, cost for power meter, new water supply.

The calculation to determine the area of ​​packages:

Cách tính diện tích thiết kế, thi công

Notes of above picture:

  • S = Total area for calculating the total cost of a package (D ~ length, R ~ width).
  • For basement depth greater than 0.6 m, then every 2 m depth will be calculated as a floor. Tiled roof above the concrete floor will be counted as a floor; corrugated roof above the roof deck will be charged 70% of the area. Not subtracting the area of the floor holes.